SOME OF MY RECENTLY COMPLETED JOBS
New Care Farm at Toftmonks, South Norfolk. These photos are of the Support Building in February 2011 when almost completed.
Colchester Road Baptist  Church in Ipswich, a job for new buildings that while a senior architect at Chaplin Farrant Ltd I designed and then detailed phase one construction package. The job was later completed in autumn 2010
New Conservatory followed by a first floor extension to a house at Freshwater, Isle of Wight. Having designed the schemes and obtained the necessary approvals, prepared construction details and assisted my clients with the construction phase, this job was completed in 2014.
St Peters Church in Suffolk finished in March 2011a package of alterations to improve inclusive access including a new raised oak close boarded floor throughout the nave.
A first floor domestic extension and internal alterations to a private house in Beccles. Completed in February 2011.
Christchurch, Lowestoft, Suffolk now has a new office in the church building  and a revamped youth facility in the church halls, all completed March 2012

Phases 1, 2 and 3 of Whitton Baptist Church in Ipswich are now completed.
Grade 2 listed St Pauls Church Barton, Newport Isle of Wight
The scheme of internal reordering with a new oak floor and wall panelling was completed in 2014. A further scheme replacing the heating and upgrading the lighting was completed in 2019.